| Return to Index | Read Prev Msg | Read Next Msg |

Slink-e / CDJ Discussion Archive #6

Re: Digital Crosspoint Status?

Posted By: Colby Boles <cboles@n...>
Date: 10/2/99 12:38am

In Response To: Digital Crosspoint Status? (Justin Gillis)

It really will be ready soon. I have the assembly prototypes built (using all the same parts as the final product) and my assembly house will begin producing them on Monday. It will probably be 2 weeks before I have a significant number of them built and tested. I'll be posting pictures, pricing, and new information on the DXS in a few days. I'm sorry it took so long, there was just a fair bit of work to do on it, and an number of other things I was working on.

Colby

| Return to Index | Read Prev Msg | Read Next Msg |

Password:

Slink-e / CDJ Discussion Archive #6 is maintained by slinke-bbs-owner@nirvis.com with WebBBS 3.21.